DIGITAL SIGNAGE SUPPORT

Digital Information Displays (Digital Signage) => MagicInfo => Topic started by: eibhrum on January 13, 2011, 08:38:52 AM

Title: How to loop a 2 minute screen in the schedule?
Post by: eibhrum on January 13, 2011, 08:38:52 AM
 ??? I have a screen which has a playing time of 2 minutes only. I'm just wondering if there's a way to loop the screen for about an hour or two, instead of adding the screen minute by minute (I'm using the 1 minute interval)
Title: Re: How to loop a 2 minute screen in the schedule?
Post by: fluidium on January 13, 2011, 10:33:36 AM
Hi,

do a couple of repeats of your two minutes, say 5 (making a total of 10 minutes), then set the main background time of the screen file to 10 minutes (the first item on the content tree on the left).
Title: Re: How to loop a 2 minute screen in the schedule?
Post by: eibhrum on January 13, 2011, 10:35:26 AM
Let's say I manage to create a 10-minute playing screen. How can I add it to the schedule without copy-pasting it to make an hour?
Title: Re: How to loop a 2 minute screen in the schedule?
Post by: mrmrva on January 13, 2011, 12:26:52 PM
Just set start and stop time in schedule that you want (lets say from 9:00-11:00) and it will play for 2 hours.