I'm having an issue that I can't figure out. We have a schedule published that loops a powerpoint slide deck every morning and of the 15 slides, one slide can change daily or even more than once, where we change out the visitors to our office.
I have not been able to figure out how to force a download, or in this case a re-download, after we have made a change to this one slide in the powerpoint deck. The powerpoint was copied over the old version with the same name in the same directory, or changed in place. neither approach triggered a download. What is the trick to get this powerpoint resent to the monitor? If I force a schedule push, my slide deck does not get picked up. I have used the logs to verify what is being pushed.
As a workaround I have been creating new screen for each day, and then adding it to the schedule.
There has to be something I'm missing. I can't see a way to trigger just getting it resent.
I'm looking to the resident experts to help me, I'm sure it's simple but I'm just missing it.
Thanks in advance